Hobart Repair

Will need to remove lockout to popwer up generator and test phase

Removed Lockout. Found Oyutput COntractors are mot closed so even though power is generated iyt’s not seen at output. Need to add two switches to close and open contactrors.

Sam installed swithes to enable the output contactors to close. I need to send an email to the vedndor. The Terminal Board used for the output control has some undocumented jumpers installed. Hopefully the vendor has a idea of what they are for, 7/31